Assessment Year | 2018 |
---|---|
Principal Product | Cottage Cheese and Greek Yogurt |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 120 |
Plant Area |
187,500
ft2
|
Annual Production | 15,000,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $434,903 | 10,030,933 |
kWh
|
$0.043 | |
Electricity Demand | $20,137 | 2,075 |
kW-mo/yr
|
$9.70 | |
Electricity Fees | $21,354 | - |
|
- | |
Natural Gas | $209,308 | 59,826 |
MMBtu
|
$3.50 | |
Waste Disposal Costs | |||||
Water Usage | $339,020 | 63,250 |
Tgal
|
$5.36 | |
TOTAL YEARLY COSTS | $1,024,722 | ||||
RECOMMENDED SAVINGS* | $61,057 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $37,902 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $3,006 | - | - | - |
$3,006
-
MMBtu
|
- | |
02 | 3.1161: Eliminate/reduce an operation | $6,208 | $888 | - | - | - | $6,208 | |
03 | 2.4221: Install compressor air intakes in coolest locations | $995 | $734 |
$995
23,143
kWh
|
- | - | - | |
04 | 2.7314: Reduce ventilation air | $1,085 | $882 |
$480
11,162
kWh
|
- |
$605
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $36,395 | $32,434 |
$21,808
507,151
kWh
|
$8,442
-
kW-mo/yr
|
- | $6,145 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $513 | $531 |
$94
2,190
kWh
|
$29
-
kW-mo/yr
|
- | $390 | |
07 | 2.1336: Install equipment to utilize waste fuel | $2,737 | $3,700 | - | - |
$2,737
-
MMBtu
|
- | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $10,119 | $40,600 | - | - |
$10,119
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $61,057 | $79,769 |
$23,377
543,646
kWh
|
$8,471
-
kW-mo/yr
|
$16,467
-
MMBtu
|
$12,743 | ||
TOTAL IMPLEMENTED | $37,902 | $33,699 |
$22,897
532,484
kWh
|
$8,471
-
kW-mo/yr
|
- | $6,535 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs