ITAC Assessment: SU0469
ITAC logo
ITAC Assessment: SU0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Cottage Cheese and Greek Yogurt
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 187,500
ft2
Annual Production 15,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $434,903 10,030,933
kWh
Electricity Demand $20,137 2,075
kW-mo/yr
Electricity Fees $21,354 -
Natural Gas $209,308 59,826
MMBtu
Waste Disposal Costs
Water Usage $339,020 63,250
Tgal
TOTAL YEARLY COSTS $1,024,722
RECOMMENDED SAVINGS* $61,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,902

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $3,006 - - - $3,006
-
MMBtu
-
02 3.1161: Eliminate/reduce an operation $6,208 $888 - - - $6,208
03 2.4221: Install compressor air intakes in coolest locations $995 $734 $995
23,143
kWh
- - -
04 2.7314: Reduce ventilation air $1,085 $882 $480
11,162
kWh
- $605
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $36,395 $32,434 $21,808
507,151
kWh
$8,442
-
kW-mo/yr
- $6,145
06 2.7142: Utilize higher efficiency lamps and/or ballasts $513 $531 $94
2,190
kWh
$29
-
kW-mo/yr
- $390
07 2.1336: Install equipment to utilize waste fuel $2,737 $3,700 - - $2,737
-
MMBtu
-
08 2.2414: Use waste heat from hot flue gases to preheat $10,119 $40,600 - - $10,119
-
MMBtu
-
TOTAL RECOMMENDED $61,057 $79,769 $23,377
543,646
kWh
$8,471
-
kW-mo/yr
$16,467
-
MMBtu
$12,743
TOTAL IMPLEMENTED $37,902 $33,699 $22,897
532,484
kWh
$8,471
-
kW-mo/yr
- $6,535
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs