Assessment Year | 2012 |
---|---|
Principal Product | auto components |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 270 |
Plant Area |
203,840
ft2
|
Annual Production | 42,500,000
pieces
|
Production Hrs. Annual | 4,375
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $235,858 | 6,197,000 |
kWh
|
$0.038 |
Electricity Demand | $142,689 | 11,026 |
kW-mo/yr
|
$12.94 |
Natural Gas | $33,078 | 3,783 |
MMBtu
|
$8.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,984 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,282 | $47,885 |
$18,610
474,767
kWh
|
$19,672
-
kW-mo/yr
|
- | |
02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $15,755 | $17,500 |
$6,790
173,214
kWh
|
$8,965
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $5,437 | $4,000 |
$5,437
138,692
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,410 | $200 |
$4,410
112,489
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $3,287 | $5,040 |
$3,287
83,862
kWh
|
- | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $706 | $10 |
$706
18,000
kWh
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $3,660 | $4,000 | - | - |
$3,660
-
MMBtu
|
|
08 | 2.7313: Recycle air for heating, ventilation and air conditioning | $1,447 | $4,000 | - | - |
$1,447
-
MMBtu
|
|
TOTAL RECOMMENDED | $72,984 | $82,635 |
$39,240
1,001,024
kWh
|
$28,637
-
kW-mo/yr
|
$5,107
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs