ITAC Assessment: UM0397
ITAC logo
ITAC Assessment: UM0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product stainless steel
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 148
Plant Area 118,420
ft2
Annual Production 45,000,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,401 3,892,000
kWh
Electricity Demand $117,593 7,226
kW-mo/yr
Natural Gas $32,000 3,450
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,607 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,272

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4224: Upgrade controls on compressors $5,033 $200 $1,393
29,640
kWh
$3,640
-
kW-mo/yr
02 2.2437: Recover waste heat from equipment $13,335 $30,200 $13,335
283,720
kWh
-
03 2.6211: Conserve energy by efficient use of vending machines $239 $10 $239
5,100
kWh
-
TOTAL RECOMMENDED $18,607 $30,410 $14,967
318,460
kWh
$3,640
-
kW-mo/yr
TOTAL IMPLEMENTED $5,272 $210 $1,632
34,740
kWh
$3,640
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs