ITAC Assessment: UM0394
ITAC logo
ITAC Assessment: UM0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product frozen fruit, juice, vegetable
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 525
Plant Area 115,250
ft2
Annual Production 90,000,000
lb
Production Hrs. Annual 3,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,731,110 31,670,400
kWh
Electricity Demand $442,115 68,157
kW-mo/yr
Natural Gas $688,140 70,362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,109 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,893 $37,992 $14,544
274,417
kWh
$3,349
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $6,227 $12,120 $6,227
117,480
kWh
- - -
03 2.3212: Optimize plant power factor $4,589 $3,850 - - $4,589 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,147 $200 $2,147
40,517
kWh
- - -
05 2.2511: Insulate bare equipment $1,971 $2,584 $1,971
37,197
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,811 $5,000 $1,811
34,172
kWh
- - -
07 2.7135: Install occupancy sensors $1,389 $1,350 $1,389
26,220
kWh
- - -
08 2.6211: Conserve energy by efficient use of vending machines $180 $10 $180
3,400
kWh
- - -
09 2.2437: Recover waste heat from equipment $7,902 $10,000 - - - $7,902
-
MMBtu
TOTAL RECOMMENDED $44,109 $73,106 $28,269
533,403
kWh
$3,349
-
kW-mo/yr
$4,589 $7,902
-
MMBtu
TOTAL IMPLEMENTED $4,118 $2,784 $4,118
77,714
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings