ITAC Assessment: LE0354
ITAC logo
ITAC Assessment: LE0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Steel Casting
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area 9,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,250
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $298,179 3,313,095
kWh
Electricity Demand $49,404 9,881
kW-mo/yr
Electricity Fees $26,134 -
Natural Gas $11,562 1,116
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,623 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,024 $8,775 $2,180
24,219
kWh
$450
-
kW-mo/yr
$394
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,607 $4,575 $1,292
14,352
kWh
$265
-
kW-mo/yr
$50
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,533 $21 $1,273
14,148
kWh
$260
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $459 $42 $459
5,097
kWh
- -
TOTAL RECOMMENDED $6,623 $13,412 $5,204
57,816
kWh
$975
-
kW-mo/yr
$444
TOTAL IMPLEMENTED $1,992 $62 $1,732
19,245
kWh
$260
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs