| Assessment Year | 2013 |
|---|---|
| Principal Product | Steel Casting |
| NAICS | 331513: Steel Foundries (except Investment) |
| SIC | 3325: Steel Foundries, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 14 |
| Plant Area |
9,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 3,250
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $298,179 | 3,313,095 |
kWh
|
$0.090 |
| Electricity Demand | $49,404 | 9,881 |
kW-mo/yr
|
$5.00 |
| Electricity Fees | $26,134 | - |
|
- |
| Natural Gas | $11,562 | 1,116 |
MMBtu
|
$10.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,623 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,992 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,024 | $8,775 |
$2,180
24,219
kWh
|
$450
-
kW-mo/yr
|
$394 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,607 | $4,575 |
$1,292
14,352
kWh
|
$265
-
kW-mo/yr
|
$50 | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,533 | $21 |
$1,273
14,148
kWh
|
$260
-
kW-mo/yr
|
- | |
| 04 | 2.2511: Insulate bare equipment | $459 | $42 |
$459
5,097
kWh
|
- | - | |
| TOTAL RECOMMENDED | $6,623 | $13,412 |
$5,204
57,816
kWh
|
$975
-
kW-mo/yr
|
$444 | ||
| TOTAL IMPLEMENTED | $1,992 | $62 |
$1,732
19,245
kWh
|
$260
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs