ITAC Assessment: UM0390
ITAC logo
ITAC Assessment: UM0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Thermoformed plastic food packaging
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 152
Plant Area 390,000
ft2
Annual Production 20,300,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $910,345 16,749,549
kWh
Electricity Demand $473,788 32,140
kW-mo/yr
Natural Gas $230,287 31,008
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $16,753 $200 $12,213
224,715
kWh
$4,540
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $11,887 $2,716 $8,674
159,599
kWh
$3,213
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $11,502 $10,000 $8,407
154,679
kWh
$3,095
-
kW-mo/yr
-
04 2.7314: Reduce ventilation air $109,437 $163,095 - - $109,437
-
MMBtu
05 2.2449: Recover heat from exhausted steam, hot air or hot water $27,012 $59,940 - - $27,012
-
MMBtu
06 2.2437: Recover waste heat from equipment $6,628 $5,000 - - $6,628
-
MMBtu
TOTAL RECOMMENDED $183,219 $240,951 $29,294
538,993
kWh
$10,848
-
kW-mo/yr
$143,077
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs