ITAC Assessment: UM0386
ITAC logo
ITAC Assessment: UM0386
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Polyolephin Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 93
Plant Area 185,000
ft2
Annual Production 41,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $503,419 8,133,840
kWh
Electricity Demand $244,807 14,622
kW-mo/yr
Natural Gas $41,245 5,651
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,546

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $3,851 $2,100 $3,851
57,837
kWh
- -
02 2.4224: Upgrade controls on compressors $2,043 $3,615 $2,043
33,000
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,167 $1,000 $1,167
18,848
kWh
- -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $2,885 $18,495 - $2,885
-
MMBtu
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,336 $2,471 - $2,336
-
MMBtu
-
06 2.2437: Recover waste heat from equipment $2,285 $1,000 - $2,285
-
MMBtu
-
07 2.8114: Change rate schedules or other changes in utility service $982 $10 - - $982
08 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $16,332 $92,500 - $16,332
-
MMBtu
-
TOTAL RECOMMENDED $31,881 $121,191 $7,061
109,685
kWh
$23,838
-
MMBtu
$982
TOTAL IMPLEMENTED $5,546 $7,086 $3,210
51,848
kWh
$2,336
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs