ITAC Assessment: UM0382
ITAC logo
ITAC Assessment: UM0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Work Surfaces
NAICS 337127: Institutional Furniture Manufacturing
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 125,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,562 4,440,481
kWh
Electricity Demand $122,962 7,782
kW-mo/yr
Natural Gas $350,932 42,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $252 $1,000 $252
4,916
kWh
- - -
02 2.6211: Conserve energy by efficient use of vending machines $87 $10 $87
1,700
kWh
- - -
03 2.2437: Recover waste heat from equipment $3,453 $1,000 - - $3,453
-
MMBtu
-
04 2.2442: Preheat combustion air with waste heat $2,843 $2,200 - - $2,843
-
MMBtu
-
05 2.7221: Lower temperature during the winter season and vice-versa $2,115 $2,800 - - $2,115
-
MMBtu
-
06 2.2442: Preheat combustion air with waste heat $17,682 $21,309 - - $17,682
-
MMBtu
-
07 2.4226: Use / purchase optimum sized compressor $9,797 $31,000 $4,548
88,740
kWh
$2,749
-
kW-mo/yr
- $2,500
TOTAL RECOMMENDED $36,229 $59,319 $4,887
95,356
kWh
$2,749
-
kW-mo/yr
$26,093
-
MMBtu
$2,500
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs