ITAC Assessment: UF0159
ITAC logo
ITAC Assessment: UF0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Boilers
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 185,000
ft2
Annual Production 589
pieces
Production Hrs. Annual 5,824
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,027 3,118,406
kWh
Natural Gas $84,672 13,117
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,486

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,087 $20,164 $13,087
290,739
kWh
- - -
02 2.4133: Use most efficient type of electric motors $163 $389 $163
3,517
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,236 $1,350 $3,236
66,237
kWh
- - -
04 3.5316: Contract a wood pallet recycling company $8,700 - - - $8,700
-
lb
-
05 3.8132: Use less toxic and volatile solvent substitutes $3,227 - - $3,227
-
gal
- -
06 3.4111: Use closed cycle process to minimize waste water production $2,469 $7,000 $(-17.0)
(-293)
kWh
- - $2,486
-
Tgal
TOTAL RECOMMENDED $30,882 $28,903 $16,469
360,200
kWh
$3,227
-
gal
$8,700
-
lb
$2,486
-
Tgal
TOTAL IMPLEMENTED $16,486 $21,903 $16,486
360,493
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs