| Assessment Year | 1996 |
|---|---|
| Principal Product | Boilers |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $50 M to 100M |
| # of Employees | 220 |
| Plant Area |
185,000
ft2
|
| Annual Production | 589
pieces
|
| Production Hrs. Annual | 5,824
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $208,027 | 3,118,406 |
kWh
|
$0.067 |
| Natural Gas | $84,672 | 13,117 |
MMBtu
|
$6.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,882 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,486 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,087 | $20,164 |
$13,087
290,739
kWh
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $163 | $389 |
$163
3,517
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,236 | $1,350 |
$3,236
66,237
kWh
|
- | - | - | |
| 04 | 3.5316: Contract a wood pallet recycling company | $8,700 | - | - | - |
$8,700
-
lb
|
- | |
| 05 | 3.8132: Use less toxic and volatile solvent substitutes | $3,227 | - | - |
$3,227
-
gal
|
- | - | |
| 06 | 3.4111: Use closed cycle process to minimize waste water production | $2,469 | $7,000 |
$(-17.0)
(-293)
kWh
|
- | - |
$2,486
-
Tgal
|
|
| TOTAL RECOMMENDED | $30,882 | $28,903 |
$16,469
360,200
kWh
|
$3,227
-
gal
|
$8,700
-
lb
|
$2,486
-
Tgal
|
||
| TOTAL IMPLEMENTED | $16,486 | $21,903 |
$16,486
360,493
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs