Assessment Year | 2010 |
---|---|
Principal Product | Library Furniture |
NAICS | 337211: Wood Office Furniture Manufacturing |
SIC | 2531: Public Building and Related Furniture |
Sales Range | $10 M to 50M |
# of Employees | 126 |
Plant Area |
139,000
ft2
|
Annual Production | 172,388
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $128,070 | 2,447,375 |
kWh
|
$0.052 |
Electricity Demand | $85,221 | 9,383 |
kW-mo/yr
|
$9.08 |
Natural Gas | $141,259 | 11,559 |
MMBtu
|
$12.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $123,379 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,121 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 3.6123: Burn wood by-products for heat | $79,685 | $67,199 | - | - |
$79,685
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $9,763 | $100 | - | - |
$9,763
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,000 | $31,000 |
$10,816
206
kWh
|
$10,184
-
kW-mo/yr
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,484 | $1,200 | - | - |
$3,484
-
MMBtu
|
|
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $2,810 | $5,718 | - | - |
$2,810
-
MMBtu
|
|
06 | 2.2437: Recover waste heat from equipment | $2,522 | $600 | - | - |
$2,522
-
MMBtu
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,227 | $650 |
$1,147
21,921
kWh
|
$1,080
-
kW-mo/yr
|
- | |
08 | 2.7135: Install occupancy sensors | $1,137 | $5,520 |
$1,137
21,720
kWh
|
- | - | |
09 | 2.2136: Install / repair insulation on steam lines | $396 | $400 | - | - |
$396
-
MMBtu
|
|
10 | 2.4221: Install compressor air intakes in coolest locations | $355 | $750 |
$182
3,484
kWh
|
$173
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $123,379 | $113,137 |
$13,282
47,331
kWh
|
$11,437
-
kW-mo/yr
|
$98,660
-
MMBtu
|
||
TOTAL IMPLEMENTED | $31,121 | $40,120 |
$13,282
47,331
kWh
|
$11,437
-
kW-mo/yr
|
$6,402
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs