ITAC Assessment: UM0357
ITAC logo
ITAC Assessment: UM0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Coal feeders and spouts
NAICS 332510: Hardware Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $1
M
to 5
M
# of Employees 83
Plant Area 140,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,730
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,707 1,361,040
kWh
Electricity Demand $68,368 3,991
kW-mo/yr
Natural Gas $361,094 32,619
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $172,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $172,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7494: Install storm windows and doors $88,261 $361,980 - - $88,261
-
MMBtu
02 2.7231: Use radiant heater for spot heating $48,733 $25,000 - - $48,733
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $17,053 $42,818 $6,467
128,112
kWh
$10,586
-
kW-mo/yr
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $5,524 $2,591 - - $5,524
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $1,523 $1,359 - - $1,523
-
MMBtu
06 2.7135: Install occupancy sensors $1,466 $4,692 $1,466
34,510
kWh
- -
07 2.4226: Use / purchase optimum sized compressor $9,875 $7,500 $3,811
81,847
kWh
$6,064
-
kW-mo/yr
-
TOTAL RECOMMENDED $172,435 $445,940 $11,744
244,469
kWh
$16,650
-
kW-mo/yr
$144,041
-
MMBtu
TOTAL IMPLEMENTED $172,435 $445,940 $11,744
244,469
kWh
$16,650
-
kW-mo/yr
$144,041
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs