ITAC Assessment: UD0140
ITAC logo
ITAC Assessment: UD0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product MARGARINE, SHORTENING
NAICS
n/a
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 168
Plant Area
n/a
Annual Production 90,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,024 5,002,638
kWh
Natural Gas $279,115 48,317
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $947 $1,280 $947
14,947
kWh
-
02 2.2522: Isolate hot or cold equipment $2,075 $1,240 $858
30,481
kWh
$1,217
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,348 $708 $2,705
27,550
kWh
$(-357.0)
-
MMBtu
04 2.2511: Insulate bare equipment $21,331 $10,185 $2,870
50,117
kWh
$18,461
-
MMBtu
05 2.2121: Increase amount of condensate returned $3,213 $3,000 - $3,213
-
MMBtu
06 2.1224: Replace boiler $40,533 $25,000 - $40,533
-
MMBtu
07 3.4115: Recover and reuse cooling water $1,755 - $1,755
30,188
kWh
-
08 2.2437: Recover waste heat from equipment $983 $1,500 - $983
-
MMBtu
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,089 $3,000 $5,089
-
kWh
-
TOTAL RECOMMENDED $78,274 $45,913 $14,224
153,283
kWh
$64,050
-
MMBtu
TOTAL IMPLEMENTED $33,545 $16,413 $14,224
153,283
kWh
$19,321
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs