Assessment Year | 2009 |
---|---|
Principal Product | Brew Beer, for Both Kegs and Bottles |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $10 M to 50M |
# of Employees | 51 |
Plant Area |
75,511
ft2
|
Annual Production | 110,000
bbl
|
Production Hrs. Annual | 5,720
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,933 | 1,395,625 |
kWh
|
$0.060 |
Electricity Demand | $42,193 | 3,860 |
kW-mo/yr
|
$10.93 |
Natural Gas | $131,500 | 12,391 |
MMBtu
|
$10.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,511 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,141 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2123: Insulate feedwater tank | $8,739 | $3,454 | - | - |
$8,739
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $6,001 | $11,363 | - | - |
$6,001
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $4,300 | $1,700 |
$1,500
71,000
kWh
|
$2,800
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $2,569 | $1,060 | - | - |
$2,569
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,200 | - |
$1,750
18,300
kWh
|
$450
-
kW-mo/yr
|
- | |
06 | 2.2437: Recover waste heat from equipment | $1,800 | $1,900 | - | - |
$1,800
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,454 | - |
$1,053
17,503
kWh
|
$401
-
kW-mo/yr
|
- | |
08 | 2.7135: Install occupancy sensors | $504 | $920 |
$504
5,248
kWh
|
- | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,944 | $1,200 | - | - |
$3,944
-
MMBtu
|
|
TOTAL RECOMMENDED | $31,511 | $21,597 |
$4,807
112,051
kWh
|
$3,651
-
kW-mo/yr
|
$23,053
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,141 | $7,274 |
$4,807
112,051
kWh
|
$3,651
-
kW-mo/yr
|
$12,683
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs