| Assessment Year | 2008 |
|---|---|
| Principal Product | Rotational and Blow Molded Plastic Products |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 55 |
| Plant Area |
75,000
ft2
|
| Annual Production | 500,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $52,163 | 2,028,540 |
kWh
|
$0.026 |
| Electricity Demand | $71,433 | 4,992 |
kW-mo/yr
|
$14.31 |
| Natural Gas | $219,930 | 24,145 |
MMBtu
|
$9.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,261 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $9,638 | $8,898 | - | - |
$9,638
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,545 | $6,240 |
$2,161
84,076
kWh
|
$2,384
-
kW-mo/yr
|
- | |
| 03 | 2.2514: Cover open tanks | $2,233 | $1,046 |
$932
29,241
kWh
|
$1,301
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $1,503 | $500 |
$1,503
24,637
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $452 | $422 |
$145
5,658
kWh
|
$307
-
kW-mo/yr
|
- | |
| 06 | 2.1123: Install automatic stack damper | $29,890 | $8,100 | - | - |
$29,890
-
MMBtu
|
|
| TOTAL RECOMMENDED | $48,261 | $25,206 |
$4,741
143,612
kWh
|
$3,992
-
kW-mo/yr
|
$39,528
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs