ITAC Assessment: UM0341
ITAC logo
ITAC Assessment: UM0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Recycled Boxboard
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 101
Plant Area 200,000
ft2
Annual Production 70,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $852,923 39,499,200
kWh
Electricity Demand $929,560 63,600
kW-mo/yr
Natural Gas $1,889,489 240,625
MMBtu
Fuel Oil #6 $1,695,881 274,718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $245,191 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $79,804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $101,548 $18,088 - - $101,548
-
MMBtu
02 2.2511: Insulate bare equipment $79,804 $53,414 - - $79,804
-
MMBtu
03 2.2437: Recover waste heat from equipment $31,965 $59,142 - - $31,965
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $13,835 $4,800 $7,032
325,722
kWh
$6,803
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $8,572 $5,000 - - $8,572
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,111 $8,160 $3,106
143,875
kWh
$3,005
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $3,356 $515 $1,704
78,885
kWh
$1,652
-
kW-mo/yr
-
TOTAL RECOMMENDED $245,191 $149,119 $11,842
548,482
kWh
$11,460
-
kW-mo/yr
$221,889
-
MMBtu
TOTAL IMPLEMENTED $79,804 $53,414 - - $79,804
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs