Assessment Year | 2008 |
---|---|
Principal Product | Recycled Boxboard |
NAICS | 322130: Paperboard Mills |
SIC | 2631: Paperboard Mills |
Sales Range | $10 M to 50M |
# of Employees | 101 |
Plant Area |
200,000
ft2
|
Annual Production | 70,000
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $852,923 | 39,499,200 |
kWh
|
$0.022 |
Electricity Demand | $929,560 | 63,600 |
kW-mo/yr
|
$14.62 |
Natural Gas | $1,889,489 | 240,625 |
MMBtu
|
$7.85 |
Fuel Oil #6 | $1,695,881 | 274,718 |
MMBtu
|
$6.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $245,191 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $79,804 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $101,548 | $18,088 | - | - |
$101,548
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $79,804 | $53,414 | - | - |
$79,804
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $31,965 | $59,142 | - | - |
$31,965
-
MMBtu
|
|
04 | 2.4239: Eliminate or reduce compressed air usage | $13,835 | $4,800 |
$7,032
325,722
kWh
|
$6,803
-
kW-mo/yr
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $8,572 | $5,000 | - | - |
$8,572
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,111 | $8,160 |
$3,106
143,875
kWh
|
$3,005
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $3,356 | $515 |
$1,704
78,885
kWh
|
$1,652
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $245,191 | $149,119 |
$11,842
548,482
kWh
|
$11,460
-
kW-mo/yr
|
$221,889
-
MMBtu
|
||
TOTAL IMPLEMENTED | $79,804 | $53,414 | - | - |
$79,804
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs