ITAC Assessment: UM0328
ITAC logo
ITAC Assessment: UM0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aluminum impacts and forgings
NAICS 332112: Nonferrous Forging
SIC 3463: Nonferrous Forgings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 80,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,612 6,546,720
kWh
Electricity Demand $165,451 13,804
kW-mo/yr
Electricity Fees $10,667 -
Natural Gas $738,347 98,903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,735

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $13,110 $1,000 - - - $13,110
-
MMBtu
02 2.2437: Recover waste heat from equipment $8,957 $4,000 - - - $8,957
-
MMBtu
03 2.3212: Optimize plant power factor $6,128 $8,790 - - $6,128 -
04 2.2514: Cover open tanks $5,154 $1,500 - - - $5,154
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,079 $45,000 $3,283
78,566
kWh
$1,796
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $3,450 $1,000 $2,359
56,457
kWh
$1,091
-
kW-mo/yr
- -
07 2.2414: Use waste heat from hot flue gases to preheat $2,637 $50,000 - - - $2,637
-
MMBtu
08 2.7135: Install occupancy sensors $2,167 $644 $2,167
51,896
kWh
- - -
09 2.2511: Insulate bare equipment $2,032 $1,604 - - - $2,032
-
MMBtu
10 2.2511: Insulate bare equipment $1,625 $1,238 - - - $1,625
-
MMBtu
11 2.2414: Use waste heat from hot flue gases to preheat $1,083 $1,350 - - - $1,083
-
MMBtu
12 2.2414: Use waste heat from hot flue gases to preheat $515 $1,000 $515
69
kWh
- - -
13 2.2511: Insulate bare equipment $493 $307 - - - $493
-
MMBtu
TOTAL RECOMMENDED $52,430 $117,433 $8,324
186,988
kWh
$2,887
-
kW-mo/yr
$6,128 $35,091
-
MMBtu
TOTAL IMPLEMENTED $14,735 $2,238 - - - $14,735
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs