ITAC Assessment: UM0318
ITAC logo
ITAC Assessment: UM0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Sippable Soup and Gravy
NAICS 311422: Specialty Canning
SIC 2032: Canned Specialties
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 103,000
ft2
Annual Production 10,400,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $523,091 7,653,600
kWh
Electricity Demand $135,251 14,780
kW-mo/yr
Electricity Fees $8,109 -
Natural Gas $1,216,937 105,013
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,540 $14,000 - - $9,540
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,573 $7,025 $6,298
92,145
kWh
$2,275
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $8,279 - $6,531
95,550
kWh
$1,748
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $7,947 $4,500 $5,767
84,379
kWh
$2,180
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $2,647 $120 $1,921
28,103
kWh
$726
-
kW-mo/yr
-
06 2.2414: Use waste heat from hot flue gases to preheat $1,516 $1,650 - - $1,516
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,215 $75 $881
12,892
kWh
$334
-
kW-mo/yr
-
08 2.2511: Insulate bare equipment $766 $454 - - $766
-
MMBtu
TOTAL RECOMMENDED $40,483 $27,824 $21,398
313,069
kWh
$7,263
-
kW-mo/yr
$11,822
-
MMBtu
TOTAL IMPLEMENTED $29,628 $18,695 $15,100
220,924
kWh
$4,988
-
kW-mo/yr
$9,540
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs