ITAC Assessment: BD0409
ITAC logo
ITAC Assessment: BD0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Centrifugal pumps
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 80,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,509 2,086,280
kWh
Electricity Demand $66,144 9,022
kW-mo/yr
Electricity Fees $99 -
Natural Gas $21,445 2,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,652 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,369

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,259 $41,728 $11,853
241,428
kWh
$3,406
-
kW-mo/yr
- - - - -
02 2.7135: Install occupancy sensors $11,228 $2,550 $9,350
190,437
kWh
$1,878
-
kW-mo/yr
- - - - -
03 2.2437: Recover waste heat from equipment $4,270 $2,500 $(-154.0)
(-3,120)
kWh
$(-48.0)
-
kW-mo/yr
$4,472
-
MMBtu
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,040 $3,510 $1,426
29,070
kWh
$614
-
kW-mo/yr
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,253 $10 $2,505
51,026
kWh
$748
-
kW-mo/yr
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $793 $500 $610
12,431
kWh
$183
-
kW-mo/yr
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $535 $450 $262
5,326
kWh
$53
-
kW-mo/yr
- - - $92 $128
08 2.7134: Use photocell controls $307 $200 $200
4,082
kWh
$107
-
kW-mo/yr
- - - - -
09 3.4111: Use closed cycle process to minimize waste water production $1,782 $1,500 - - - $1,782
-
Tgal
- - -
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $1,032 $1,600 - - - - - - $1,032
11 3.3131: Use evaporation to concentrate material $153 $600 $(-285.0)
(-5,797)
kWh
- - - $1,188
-
gal
$(-750.0) -
TOTAL RECOMMENDED $40,652 $55,148 $25,767
524,883
kWh
$6,941
-
kW-mo/yr
$4,472
-
MMBtu
$1,782
-
Tgal
$1,188
-
gal
$(-658.0) $1,160
TOTAL IMPLEMENTED $29,369 $48,438 $23,091
470,343
kWh
$6,058
-
kW-mo/yr
- - - $92 $128
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs