ITAC Assessment: UM0308
ITAC logo
ITAC Assessment: UM0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Powder Coating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 37,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,420
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,350 327,654
kWh
Electricity Demand $6,252 544
kW-mo/yr
Electricity Fees $393 -
Natural Gas $142,808 13,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,878 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1133: Adjust burners for efficient operation $3,769 $500 - $3,769
-
MMBtu
02 2.7314: Reduce ventilation air $2,507 $500 - $2,507
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $2,070 $1,250 - $2,070
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,462 $3,479 $1,462
15,886
kWh
-
05 2.2531: Re-size charging openings or add movable cover or door $536 $300 - $536
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $392 $1,000 $392
4,256
kWh
-
07 2.2511: Insulate bare equipment $142 $310 - $142
-
MMBtu
TOTAL RECOMMENDED $10,878 $7,339 $1,854
20,142
kWh
$9,024
-
MMBtu
TOTAL IMPLEMENTED $7,204 $2,300 $392
4,256
kWh
$6,812
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs