Assessment Year | 2010 |
---|---|
Principal Product | Dry mix cement and concrete products |
NAICS | 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 71 |
Plant Area |
47,720
ft2
|
Annual Production | 6,120,000
pieces
|
Production Hrs. Annual | 4,512
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,591 | 1,930,560 |
kWh
|
$0.035 |
Electricity Demand | $104,160 | 6,508 |
kW-mo/yr
|
$16.00 |
Electricity Fees | $719 | - |
|
- |
Natural Gas | $139,005 | 32,286 |
MMBtu
|
$4.31 |
LPG | $33,161 | 2,132 |
MMBtu
|
$15.55 |
Fuel Oil #2 | $12,547 | 849 |
MMBtu
|
$14.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,960 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,110 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,340 | $2,810 |
$1,820
40,900
kWh
|
$2,520
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,430 | $1,000 |
$1,260
28,300
kWh
|
$2,170
-
kW-mo/yr
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,750 | $7,500 |
$730
16,300
kWh
|
$1,020
-
kW-mo/yr
|
- | - | - | |
04 | 2.2511: Insulate bare equipment | $1,210 | $430 | - | - |
$1,210
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,680 | $25,000 |
$2,700
60,800
kWh
|
$2,640
-
kW-mo/yr
|
- | $70 | $270 | |
06 | 2.9114: Use solar heat to make electricty | $3,550 | $21,000 |
$1,300
29,200
kWh
|
$2,250
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $19,960 | $57,740 |
$7,810
175,500
kWh
|
$10,600
-
kW-mo/yr
|
$1,210
-
MMBtu
|
$70 | $270 | ||
TOTAL IMPLEMENTED | $9,110 | $26,000 |
$3,960
89,100
kWh
|
$4,810
-
kW-mo/yr
|
- | $70 | $270 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs