ITAC Assessment: CO0633
ITAC logo
ITAC Assessment: CO0633
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Dry mix cement and concrete products
NAICS 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 47,720
ft2
Annual Production 6,120,000
pieces
Production Hrs. Annual 4,512
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,591 1,930,560
kWh
Electricity Demand $104,160 6,508
kW-mo/yr
Electricity Fees $719 -
Natural Gas $139,005 32,286
MMBtu
LPG $33,161 2,132
MMBtu
Fuel Oil #2 $12,547 849
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,340 $2,810 $1,820
40,900
kWh
$2,520
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,430 $1,000 $1,260
28,300
kWh
$2,170
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $1,750 $7,500 $730
16,300
kWh
$1,020
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $1,210 $430 - - $1,210
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,680 $25,000 $2,700
60,800
kWh
$2,640
-
kW-mo/yr
- $70 $270
06 2.9114: Use solar heat to make electricty $3,550 $21,000 $1,300
29,200
kWh
$2,250
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $19,960 $57,740 $7,810
175,500
kWh
$10,600
-
kW-mo/yr
$1,210
-
MMBtu
$70 $270
TOTAL IMPLEMENTED $9,110 $26,000 $3,960
89,100
kWh
$4,810
-
kW-mo/yr
- $70 $270
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs