Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Radio Towers, Floating boat docks
NAICS
n/a
SIC 3040:
Sales Range $1
M
to 5
M
# of Employees 13
Plant Area 38,000
ft2
Annual Production 15,009,600
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,186 161,782
kWh
Electricity Demand $70 99
kW-mo/yr
Natural Gas $19,343 3,273
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,169 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,677

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.211: Consider use / purchase of bulk materials where possible $5,890 - - - - - $5,890
02 2.7224: Reduce space conditioning during non-working hours $4,148 $500 - - $4,148
-
MMBtu
- -
03 2.8113: Purchase gas directly from a contract gas supplier $2,651 - - - - $2,651 -
04 3.3123: Use decanting, flotation to remove contaminants $693 $600 - - - $693 -
05 2.4231: Reduce the pressure of compressed air to the minimum required $201 - $201
3,224
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $586 $2,820 $548
8,792
kWh
$38
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $14,169 $3,920 $749
12,016
kWh
$38
-
kW-mo/yr
$4,148
-
MMBtu
$3,344 $5,890
TOTAL IMPLEMENTED $6,677 $2,820 $749
12,016
kWh
$38
-
kW-mo/yr
- - $5,890
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs