ITAC Assessment: UM0303
ITAC logo
ITAC Assessment: UM0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product cement type I & III
NAICS 327310: Cement Manufacturing
SIC 3241: Cement, Hydraulic
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 2,633,400
ft2
Annual Production 920,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,606,023 129,964,880
kWh
Electricity Demand $2,184,220 108,000
kW-mo/yr
Electricity Fees $9,702 -
Natural Gas $755,250 1,794,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $358,171 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Consumption Savings
01 2.2437: Recover waste heat from equipment $338,489 $344,200 $180,776
6,514,450
kWh
$180,928
-
kW-mo/yr
$(-23,215.0)
-
Tgal
02 2.4221: Install compressor air intakes in coolest locations $7,914 $1,100 $2,819
101,590
kWh
$5,095
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,020 $7,545 $3,009
108,422
kWh
$3,011
-
kW-mo/yr
-
04 2.7124: Make a practice of turning off lights when not needed $3,089 $1,000 $1,985
71,548
kWh
$1,104
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $2,659 $552 $2,659
95,830
kWh
- -
TOTAL RECOMMENDED $358,171 $354,397 $191,248
6,891,840
kWh
$190,138
-
kW-mo/yr
$(-23,215.0)
-
Tgal
TOTAL IMPLEMENTED $7,914 $1,100 $2,819
101,590
kWh
$5,095
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs