ITAC Assessment: UM0299
ITAC logo
ITAC Assessment: UM0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Metal Stamping: Automotive Parts
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 193
Plant Area 250,625
ft2
Annual Production 18,755,862
pieces
Production Hrs. Annual 5,100
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $382,377 10,935,120
kWh
Electricity Demand $368,352 23,253
kW-mo/yr
Electricity Fees $53,485 -
Natural Gas $1,714,486 20,068
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,965

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $36,291 $720 - - $36,291
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,496 $8,700 $8,951
255,952
kWh
$9,545
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,108 $9,353 $5,793
166,511
kWh
$7,315
-
kW-mo/yr
-
04 2.7111: Reduce illumination to minimum necessary levels $11,706 $738 $6,243
179,437
kWh
$5,463
-
kW-mo/yr
-
05 2.7442: Keep doors and windows shut when not on use $5,156 $25 - - $5,156
-
MMBtu
06 2.7491: Insulate glazing, walls, ceilings, and roofs $1,389 $2,750 - - $1,389
-
MMBtu
07 2.7145: Install skylights $208 $184 $208
5,974
kWh
- -
TOTAL RECOMMENDED $86,354 $22,470 $21,195
607,874
kWh
$22,323
-
kW-mo/yr
$42,836
-
MMBtu
TOTAL IMPLEMENTED $84,965 $19,720 $21,195
607,874
kWh
$22,323
-
kW-mo/yr
$41,447
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs