ITAC Assessment: UM0297
ITAC logo
ITAC Assessment: UM0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Precision Machined Automotive Parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 256
Plant Area 125,865
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $408,148 11,522,946
kWh
Electricity Demand $228,462 24,425
kW-mo/yr
Electricity Fees $3,134 -
Natural Gas $11,537 2,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,401 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $8,060 $2,000 - - $8,060
-
MMBtu
02 2.2511: Insulate bare equipment $6,448 $9,089 $6,448
115,149
kWh
- -
03 2.7444: Close holes and openings in building such as broken windows $6,156 $3,450 - - $6,156
-
MMBtu
04 2.7442: Keep doors and windows shut when not on use $5,502 $3,900 - - $5,502
-
MMBtu
05 2.7124: Make a practice of turning off lights when not needed $5,020 $872 $4,727
133,432
kWh
$293
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,215 $6,601 $2,062
58,203
kWh
$1,153
-
kW-mo/yr
-
TOTAL RECOMMENDED $34,401 $25,912 $13,237
306,784
kWh
$1,446
-
kW-mo/yr
$19,718
-
MMBtu
TOTAL IMPLEMENTED $14,391 $10,923 $6,789
191,635
kWh
$1,446
-
kW-mo/yr
$6,156
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs