ITAC Assessment: UM0283
ITAC logo
ITAC Assessment: UM0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Pork Products
NAICS 112210: Hog and Pig Farming
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 72,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,361 6,165,076
kWh
Electricity Demand $141,255 14,845
kW-mo/yr
Electricity Fees $7,014 -
Natural Gas $303,292 43,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,648

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,568 $6,878 $4,721
127,582
kWh
$1,847
-
kW-mo/yr
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,056 $2,500 - - $2,306
-
MMBtu
$750
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,024 $300 $588
15,883
kWh
$436
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $873 $3,000 $502
13,564
kWh
$371
-
kW-mo/yr
- -
05 2.7229: Air condition only space necessary $793 $2,117 $524
14,163
kWh
$269
-
kW-mo/yr
- -
TOTAL RECOMMENDED $12,314 $14,795 $6,335
171,192
kWh
$2,923
-
kW-mo/yr
$2,306
-
MMBtu
$750
TOTAL IMPLEMENTED $10,648 $9,678 $5,309
143,465
kWh
$2,283
-
kW-mo/yr
$2,306
-
MMBtu
$750
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs