ITAC Assessment: AS0258
ITAC logo
ITAC Assessment: AS0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aircraft
NAICS
n/a
SIC 3721: Aircraft
Sales Range $50
M
to 100
M
# of Employees 700
Plant Area 427,494
ft2
Annual Production 60
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $682,434 10,408,851
kWh
Electricity Demand $169,209 23,966
kW-mo/yr
Electricity Fees $44,332 -
Natural Gas $217,154 35,286
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $521,563 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $8,211 $7,000 $6,863
102,872
kWh
$1,348
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,279 $1,462 $756
11,430
kWh
$100
-
kW-mo/yr
- $214 - $209
03 2.7135: Install occupancy sensors $7,596 $8,925 $6,450
96,717
kWh
$1,146
-
kW-mo/yr
- - - -
04 2.4314: Use synthetic lubricant $2,076 $2,889 $175
2,638
kWh
$67
-
kW-mo/yr
$89
-
gal
- - $1,745
05 2.7142: Utilize higher efficiency lamps and/or ballasts $61,388 $121,971 $50,867
763,189
kWh
$10,521
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $379 $240 $305
4,689
kWh
$74
-
kW-mo/yr
- - - -
07 2.7111: Reduce illumination to minimum necessary levels $4,913 $3,123 $4,041
60,668
kWh
$872
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $19,628 $20,250 $15,278
229,191
kWh
$4,350
-
kW-mo/yr
- - - -
09 2.7121: Utilize daylight whenever possible in lieu of artificial light $10,564 $6,100 $10,564
158,558
kWh
- - - - -
10 2.7132: Install timers on light switches in little used areas $49,340 $21,154 $45,577
683,763
kWh
$3,763
-
kW-mo/yr
- - - -
11 3.5111: Filter and reuse hydraulic oil $32,354 $1,600 - $(-35.0)
-
kW-mo/yr
- $(-740.0) - $33,129
12 3.6192: Use a less expensive method of waste removal $2,235 $30 - - - - $2,235 -
13 4.514: Re-arrange equipment layout to reduce handling costs $321,600 $53,760 - - - $321,600 - -
TOTAL RECOMMENDED $521,563 $248,504 $140,876
2,113,715
kWh
$22,206
-
kW-mo/yr
$89
-
gal
$321,074 $2,235 $35,083
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs