Assessment Year | 1999 |
---|---|
Principal Product | Aircraft |
NAICS |
n/a
|
SIC | 3721: Aircraft |
Sales Range | $50 M to 100M |
# of Employees | 700 |
Plant Area |
427,494
ft2
|
Annual Production | 60
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $682,434 | 10,408,851 |
kWh
|
$0.066 |
Electricity Demand | $169,209 | 23,966 |
kW-mo/yr
|
$7.06 |
Electricity Fees | $44,332 | - |
|
- |
Natural Gas | $217,154 | 35,286 |
MMBtu
|
$6.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $521,563 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $8,211 | $7,000 |
$6,863
102,872
kWh
|
$1,348
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,279 | $1,462 |
$756
11,430
kWh
|
$100
-
kW-mo/yr
|
- | $214 | - | $209 | |
03 | 2.7135: Install occupancy sensors | $7,596 | $8,925 |
$6,450
96,717
kWh
|
$1,146
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4314: Use synthetic lubricant | $2,076 | $2,889 |
$175
2,638
kWh
|
$67
-
kW-mo/yr
|
$89
-
gal
|
- | - | $1,745 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $61,388 | $121,971 |
$50,867
763,189
kWh
|
$10,521
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $379 | $240 |
$305
4,689
kWh
|
$74
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $4,913 | $3,123 |
$4,041
60,668
kWh
|
$872
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,628 | $20,250 |
$15,278
229,191
kWh
|
$4,350
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $10,564 | $6,100 |
$10,564
158,558
kWh
|
- | - | - | - | - | |
10 | 2.7132: Install timers on light switches in little used areas | $49,340 | $21,154 |
$45,577
683,763
kWh
|
$3,763
-
kW-mo/yr
|
- | - | - | - | |
11 | 3.5111: Filter and reuse hydraulic oil | $32,354 | $1,600 | - |
$(-35.0)
-
kW-mo/yr
|
- | $(-740.0) | - | $33,129 | |
12 | 3.6192: Use a less expensive method of waste removal | $2,235 | $30 | - | - | - | - | $2,235 | - | |
13 | 4.514: Re-arrange equipment layout to reduce handling costs | $321,600 | $53,760 | - | - | - | $321,600 | - | - | |
TOTAL RECOMMENDED | $521,563 | $248,504 |
$140,876
2,113,715
kWh
|
$22,206
-
kW-mo/yr
|
$89
-
gal
|
$321,074 | $2,235 | $35,083 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs