| Assessment Year | 2021 |
|---|---|
| Principal Product | Waste Water Treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $100 M to 500M |
| # of Employees | 100 |
| Plant Area |
6,500,000
ft2
|
| Annual Production | 42,000,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $2,208,203 | 76,528,314 |
kWh
|
$0.029 | |
| Electricity Demand | $3,061,389 | 131,786 |
kW-mo/yr
|
$23.23 | |
| Electricity Fees | $(-121,858.0) | - |
|
- | |
| Natural Gas | $865,098 | 410,930 |
MMBtu
|
$2.11 | |
| Waste Disposal Costs | |||||
| Water Usage | $12,000 | 3,142 |
Tgal
|
$3.82 | |
| TOTAL YEARLY COSTS | $6,024,832 | ||||
| RECOMMENDED SAVINGS* | $214,743 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $12,829 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6211: Conserve energy by efficient use of vending machines | $233 | - |
$111
3,828
kWh
|
$122
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,901 | $48 |
$906
31,256
kWh
|
$995
-
kW-mo/yr
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $4,444 | $143 |
$4,444
153,237
kWh
|
- | - | - | |
| 04 | 2.7224: Reduce space conditioning during non-working hours | $3,298 | $420 |
$113
3,906
kWh
|
- | - |
$3,185
-
MMBtu
|
|
| 05 | 2.3192: Use fossil fuel powered generator during peak demand periods | $474 | $461 | - | - | $474 | - | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $50,956 | $54,000 | - | - | - |
$50,956
-
MMBtu
|
|
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,059 | $1,227 |
$427
14,733
kWh
|
$632
-
kW-mo/yr
|
- | - | |
| 08 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $118,506 | $210,000 |
$118,506
4,086,423
kWh
|
- | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,338 | $16,716 |
$2,616
90,206
kWh
|
$3,722
-
kW-mo/yr
|
- | - | |
| 10 | 2.2511: Insulate bare equipment | $27,535 | $79,808 | - | - | - |
$27,535
-
MMBtu
|
|
| TOTAL RECOMMENDED | $214,743 | $362,822 |
$127,124
4,383,590
kWh
|
$5,470
-
kW-mo/yr
|
$474 |
$81,676
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $12,829 | $18,411 |
$4,174
143,929
kWh
|
$5,470
-
kW-mo/yr
|
- |
$3,185
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs