ITAC Assessment: IP0143
ITAC logo
ITAC Assessment: IP0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Waste Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 6,500,000
ft2
Annual Production 42,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,208,203 76,528,314
kWh
Electricity Demand $3,061,389 131,786
kW-mo/yr
Electricity Fees $(-121,858.0) -
Natural Gas $865,098 410,930
MMBtu
Waste Disposal Costs
Water Usage $12,000 3,142
Tgal
TOTAL YEARLY COSTS $6,024,832
RECOMMENDED SAVINGS* $214,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,829

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6211: Conserve energy by efficient use of vending machines $233 - $111
3,828
kWh
$122
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,901 $48 $906
31,256
kWh
$995
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $4,444 $143 $4,444
153,237
kWh
- - -
04 2.7224: Reduce space conditioning during non-working hours $3,298 $420 $113
3,906
kWh
- - $3,185
-
MMBtu
05 2.3192: Use fossil fuel powered generator during peak demand periods $474 $461 - - $474 -
06 2.2414: Use waste heat from hot flue gases to preheat $50,956 $54,000 - - - $50,956
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $1,059 $1,227 $427
14,733
kWh
$632
-
kW-mo/yr
- -
08 2.2449: Recover heat from exhausted steam, hot air or hot water $118,506 $210,000 $118,506
4,086,423
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $6,338 $16,716 $2,616
90,206
kWh
$3,722
-
kW-mo/yr
- -
10 2.2511: Insulate bare equipment $27,535 $79,808 - - - $27,535
-
MMBtu
TOTAL RECOMMENDED $214,743 $362,822 $127,124
4,383,590
kWh
$5,470
-
kW-mo/yr
$474 $81,676
-
MMBtu
TOTAL IMPLEMENTED $12,829 $18,411 $4,174
143,929
kWh
$5,470
-
kW-mo/yr
- $3,185
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings