Assessment Year | 2005 |
---|---|
Principal Product | Fluid Conveyance Hose & Tube, Assemblies for the Aerospace Industry |
NAICS | 332721: Precision Turned Product Manufacturing |
SIC | 3451: Screw Machine Products |
Sales Range | $50 M to 100M |
# of Employees | 506 |
Plant Area |
150,000
ft2
|
Annual Production | 800,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $362,325 | 6,354,965 |
kWh
|
$0.057 |
Natural Gas | $165,857 | 24,231 |
MMBtu
|
$6.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,388 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $12,587 | $640 |
$12,587
220,830
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,689 | $5,736 |
$7,689
134,886
kWh
|
- | - | |
03 | 2.2514: Cover open tanks | $2,342 | $3,510 | - |
$2,258
-
MMBtu
|
$84
-
Tgal
|
|
04 | 3.4151: Minimize water usage | $2,142 | $1,262 |
$(-2,524.0)
(-44,279)
kWh
|
- |
$4,666
-
Tgal
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $1,738 | $1,000 |
$1,738
30,485
kWh
|
- | - | |
06 | 2.2511: Insulate bare equipment | $1,070 | $1,938 | - |
$1,070
-
MMBtu
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $476 | $276 |
$476
8,344
kWh
|
- | - | |
08 | 2.7135: Install occupancy sensors | $344 | $225 |
$344
6,026
kWh
|
- | - | |
TOTAL RECOMMENDED | $28,388 | $14,587 |
$20,310
356,292
kWh
|
$3,328
-
MMBtu
|
$4,750
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs