ITAC Assessment: UM0282
ITAC logo
ITAC Assessment: UM0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Fluid Conveyance Hose & Tube, Assemblies for the Aerospace Industry
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $50
M
to 100
M
# of Employees 506
Plant Area 150,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $362,325 6,354,965
kWh
Natural Gas $165,857 24,231
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,388 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.7124: Make a practice of turning off lights when not needed $12,587 $640 $12,587
220,830
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,689 $5,736 $7,689
134,886
kWh
- -
03 2.2514: Cover open tanks $2,342 $3,510 - $2,258
-
MMBtu
$84
-
Tgal
04 3.4151: Minimize water usage $2,142 $1,262 $(-2,524.0)
(-44,279)
kWh
- $4,666
-
Tgal
05 2.4221: Install compressor air intakes in coolest locations $1,738 $1,000 $1,738
30,485
kWh
- -
06 2.2511: Insulate bare equipment $1,070 $1,938 - $1,070
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $476 $276 $476
8,344
kWh
- -
08 2.7135: Install occupancy sensors $344 $225 $344
6,026
kWh
- -
TOTAL RECOMMENDED $28,388 $14,587 $20,310
356,292
kWh
$3,328
-
MMBtu
$4,750
-
Tgal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs