ITAC Assessment: UM0281
ITAC logo
ITAC Assessment: UM0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Trailers
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 30,000
ft2
Annual Production 120
pieces
Production Hrs. Annual 3,289
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,442 278,574
kWh
Electricity Demand $4,566 1,335
kW-mo/yr
Electricity Fees $2,299 -
Natural Gas $13,339 1,436
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $4,337 $300 $(-253.0)
(-3,157)
kWh
$(-20.0)
-
kW-mo/yr
$4,610
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,591 $3,891 $2,229
27,649
kWh
$362
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $1,961 $75 $1,699
21,079
kWh
$262
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,214 $75 $1,051
13,048
kWh
$163
-
kW-mo/yr
-
05 2.7444: Close holes and openings in building such as broken windows $125 $100 - - $125
-
MMBtu
TOTAL RECOMMENDED $10,228 $4,441 $4,726
58,619
kWh
$767
-
kW-mo/yr
$4,735
-
MMBtu
TOTAL IMPLEMENTED $10,228 $4,441 $4,726
58,619
kWh
$767
-
kW-mo/yr
$4,735
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs