Assessment Year | 2005 |
---|---|
Principal Product | Trailers |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
30,000
ft2
|
Annual Production | 120
pieces
|
Production Hrs. Annual | 3,289
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $22,442 | 278,574 |
kWh
|
$0.081 |
Electricity Demand | $4,566 | 1,335 |
kW-mo/yr
|
$3.42 |
Electricity Fees | $2,299 | - |
|
- |
Natural Gas | $13,339 | 1,436 |
MMBtu
|
$9.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,228 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,228 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $4,337 | $300 |
$(-253.0)
(-3,157)
kWh
|
$(-20.0)
-
kW-mo/yr
|
$4,610
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,591 | $3,891 |
$2,229
27,649
kWh
|
$362
-
kW-mo/yr
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $1,961 | $75 |
$1,699
21,079
kWh
|
$262
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,214 | $75 |
$1,051
13,048
kWh
|
$163
-
kW-mo/yr
|
- | |
05 | 2.7444: Close holes and openings in building such as broken windows | $125 | $100 | - | - |
$125
-
MMBtu
|
|
TOTAL RECOMMENDED | $10,228 | $4,441 |
$4,726
58,619
kWh
|
$767
-
kW-mo/yr
|
$4,735
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,228 | $4,441 |
$4,726
58,619
kWh
|
$767
-
kW-mo/yr
|
$4,735
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs