ITAC Assessment: GT0504
ITAC logo
ITAC Assessment: GT0504
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Dyed Fiber
NAICS
n/a
SIC 2262: Finishers of Broadwoven Fabrics of Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 77,000
ft2
Annual Production 3,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,632 2,159,437
kWh
Natural Gas $207,018 60,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $12,225 $900 - $12,225
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $3,240 $400 - $3,240
-
MMBtu
03 3.4154: Eliminate leaks in water lines and valves $4,450 $500 - $4,450
-
MMBtu
04 2.2114: Shut off steam traps on super heated steam lines when not in use $3,630 $250 - $3,630
-
MMBtu
05 2.4133: Use most efficient type of electric motors $3,900 $11,430 $3,900
59,203
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $790 $600 $790
12,016
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,290 $500 $6,290
95,838
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,040 $5,760 $2,040
31,067
kWh
-
TOTAL RECOMMENDED $36,565 $20,340 $13,020
198,124
kWh
$23,545
-
MMBtu
TOTAL IMPLEMENTED $34,525 $14,580 $10,980
167,057
kWh
$23,545
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs