| Assessment Year | 1993 |
|---|---|
| Principal Product | Dyed Fiber |
| NAICS |
n/a
|
| SIC | 2262: Finishers of Broadwoven Fabrics of Manmade Fiber and Silk |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
77,000
ft2
|
| Annual Production | 3,500,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $141,632 | 2,159,437 |
kWh
|
$0.066 |
| Natural Gas | $207,018 | 60,690 |
MMBtu
|
$3.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $36,565 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,525 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $12,225 | $900 | - |
$12,225
-
MMBtu
|
|
| 02 | 2.2135: Repair and eliminate steam leaks | $3,240 | $400 | - |
$3,240
-
MMBtu
|
|
| 03 | 3.4154: Eliminate leaks in water lines and valves | $4,450 | $500 | - |
$4,450
-
MMBtu
|
|
| 04 | 2.2114: Shut off steam traps on super heated steam lines when not in use | $3,630 | $250 | - |
$3,630
-
MMBtu
|
|
| 05 | 2.4133: Use most efficient type of electric motors | $3,900 | $11,430 |
$3,900
59,203
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $790 | $600 |
$790
12,016
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,290 | $500 |
$6,290
95,838
kWh
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,040 | $5,760 |
$2,040
31,067
kWh
|
- | |
| TOTAL RECOMMENDED | $36,565 | $20,340 |
$13,020
198,124
kWh
|
$23,545
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $34,525 | $14,580 |
$10,980
167,057
kWh
|
$23,545
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs