ITAC Assessment: MZ0191
ITAC logo
ITAC Assessment: MZ0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Turbine Engines
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 56,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 4,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $235,306 2,643,600
kWh
Electricity Demand $50,964 12,583
kW-mo/yr
Natural Gas $30,731 3,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $10,108 $26,750 $(-694.0)
(-7,800)
kWh
$(-316.0)
-
kW-mo/yr
$11,118
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $16,902 - $15,035
168,913
kWh
$1,867
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $2,474 $3,500 $2,190
24,608
kWh
$284
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,535 $920 $3,130
35,170
kWh
$405
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,229 $3,500 $5,229
58,748
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $3,328 $2,000 $3,113
34,975
kWh
$215
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,548 $22,425 $5,795
65,100
kWh
$753
-
kW-mo/yr
-
08 2.6212: Turn off equipment during breaks, reduce operating time $10,458 - $10,458
117,495
kWh
- -
TOTAL RECOMMENDED $58,582 $59,095 $44,256
497,209
kWh
$3,208
-
kW-mo/yr
$11,118
-
MMBtu
TOTAL IMPLEMENTED $27,360 - $25,493
286,408
kWh
$1,867
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs