| Assessment Year | 1991 |
|---|---|
| Principal Product | PRINTED CIRCUITS |
| NAICS |
n/a
|
| SIC | 3643: Current-Carrying Wiring Devices |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 150,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $875,213 | 13,802,755 |
kWh
|
$0.063 |
| Natural Gas | $96,713 | 21,554 |
MMBtu
|
$4.49 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $249,111 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7233: Use properly designed and sized hvac equipment | $54,844 | $127,000 |
$54,844
865,182
kWh
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $11,865 | $50,000 |
$11,865
187,280
kWh
|
- | |
| 03 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $7,962 | $20,000 |
$7,962
171,454
kWh
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,253 | $4,496 |
$3,253
51,290
kWh
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,847 | $40 |
$7,847
123,681
kWh
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $653 | $933 |
$653
10,258
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,863 | $3,333 |
$1,863
29,308
kWh
|
- | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $5,751 | - |
$5,751
90,856
kWh
|
- | |
| 09 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $4,763 | $3,054 | - |
$4,763
-
MMBtu
|
|
| 10 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $150,310 | - |
$247,240
3,901,231
kWh
|
$(-96,930.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $249,111 | $208,856 |
$341,278
5,430,540
kWh
|
$(-92,167.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs