Assessment Year | 2004 |
---|---|
Principal Product | Stampings and Welded Assemblies |
NAICS | 336370: Motor Vehicle Metal Stamping |
SIC | 3465: Automotive Stampings |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
45,000
ft2
|
Annual Production | 45,000,000
pieces
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,337 | 466,240 |
kWh
|
$0.095 |
Electricity Fees | $(-96.0) | - |
|
- |
Natural Gas | $24,010 | 4,542 |
MMBtu
|
$5.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,186 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,881 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $10,326 | $10,958 | - |
$10,326
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,305 | $9,817 |
$3,305
36,484
kWh
|
- | |
03 | 2.4224: Upgrade controls on compressors | $2,448 | $300 |
$2,448
25,690
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,370 | $300 |
$1,370
14,380
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $737 | $200 |
$737
7,733
kWh
|
- | |
TOTAL RECOMMENDED | $18,186 | $21,575 |
$7,860
84,287
kWh
|
$10,326
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,881 | $11,758 |
$4,555
47,803
kWh
|
$10,326
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs