ITAC Assessment: UM0253
ITAC logo
ITAC Assessment: UM0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Industrial Scales
NAICS 333997: Scale and Balance Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 55,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 3,250
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,525 801,420
kWh
Electricity Demand $24,757 1,968
kW-mo/yr
Electricity Fees $4,030 -
Natural Gas $20,788 3,595
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,458 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,403

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,527 $19,692 $7,577
137,780
kWh
$2,950
-
kW-mo/yr
- -
02 2.7243: Improve air circulation with destratification fans / other methods $9,810 $3,150 $(-363.0)
(-6,151)
kWh
- $10,173
-
MMBtu
-
03 2.7224: Reduce space conditioning during non-working hours $5,558 $750 - - $5,558
-
MMBtu
-
04 3.5217: Reuse / recycle/ sell paper products $3,806 $9,583 - - - $3,806
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,055 $1,229 - - $2,055
-
MMBtu
-
06 2.7444: Close holes and openings in building such as broken windows $1,580 $810 - - $1,580
-
MMBtu
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $122 $5 - - $122
-
MMBtu
-
TOTAL RECOMMENDED $33,458 $35,219 $7,214
131,629
kWh
$2,950
-
kW-mo/yr
$19,488
-
MMBtu
$3,806
TOTAL IMPLEMENTED $31,403 $33,990 $7,214
131,629
kWh
$2,950
-
kW-mo/yr
$17,433
-
MMBtu
$3,806
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs