ITAC Assessment: UM0250
ITAC logo
ITAC Assessment: UM0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Stampings
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area 40,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,985 399,840
kWh
Natural Gas $15,418 3,086
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,312 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,412

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.5217: Reuse / recycle/ sell paper products $4,620 $500 - - $4,620
-
lb
02 2.4224: Upgrade controls on compressors $4,215 $1,500 $4,215
44,375
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,480 $1,572 $3,480
36,635
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $3,215 $4,000 $3,215
33,839
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,097 $1,125 $3,097
32,597
kWh
- -
06 2.2437: Recover waste heat from equipment $925 $1,500 - $925
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $760 $10,000 $760
8,007
kWh
- -
TOTAL RECOMMENDED $20,312 $20,197 $14,767
155,453
kWh
$925
-
MMBtu
$4,620
-
lb
TOTAL IMPLEMENTED $14,412 $7,197 $9,792
103,071
kWh
- $4,620
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs