Assessment Year | 1998 |
---|---|
Principal Product | machining services |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 340 |
Plant Area |
147,000
ft2
|
Annual Production | 360,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $260,651 | 6,703,107 |
kWh
|
$0.039 |
Electricity Demand | $77,810 | 14,376 |
kW-mo/yr
|
$5.41 |
Natural Gas | $36,814 | 7,985 |
MMBtu
|
$4.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $135,204 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $106,807 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,647 | $53,193 |
$15,790
408,265
kWh
|
$3,857
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.7135: Install occupancy sensors | $2,579 | $1,064 |
$2,579
66,823
kWh
|
- | - | - | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,935 | $700 |
$1,551
40,152
kWh
|
$384
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $20,305 | $2,250 | - | - | - |
$5,005
-
gal
|
- | - | $15,300 | |
05 | 3.7198: Reduce / eliminate use of disposable product | $8,750 | $1,448 | - | - | - | - |
$6,006
-
lb
|
- | $2,744 | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $57,028 | $800 |
$80,222
2,073,564
kWh
|
$19,349
-
kW-mo/yr
|
$(-42,543.0)
-
MMBtu
|
- | - | - | - | |
07 | 4.322: Eliminate old stock and modify inventory control | $24,960 | $25,440 | - | - | - | - | - | $24,960 | - | |
TOTAL RECOMMENDED | $135,204 | $84,895 |
$100,142
2,588,804
kWh
|
$23,590
-
kW-mo/yr
|
$(-42,543.0)
-
MMBtu
|
$5,005
-
gal
|
$6,006
-
lb
|
$24,960 | $18,044 | ||
TOTAL IMPLEMENTED | $106,807 | $30,254 |
$84,352
2,180,539
kWh
|
$19,733
-
kW-mo/yr
|
$(-42,543.0)
-
MMBtu
|
$5,005
-
gal
|
- | $24,960 | $15,300 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs