ITAC Assessment: IA0211
ITAC logo
ITAC Assessment: IA0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product machining services
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 340
Plant Area 147,000
ft2
Annual Production 360,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,651 6,703,107
kWh
Electricity Demand $77,810 14,376
kW-mo/yr
Natural Gas $36,814 7,985
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106,807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,647 $53,193 $15,790
408,265
kWh
$3,857
-
kW-mo/yr
- - - - -
02 2.7135: Install occupancy sensors $2,579 $1,064 $2,579
66,823
kWh
- - - - - -
03 2.4221: Install compressor air intakes in coolest locations $1,935 $700 $1,551
40,152
kWh
$384
-
kW-mo/yr
- - - - -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $20,305 $2,250 - - - $5,005
-
gal
- - $15,300
05 3.7198: Reduce / eliminate use of disposable product $8,750 $1,448 - - - - $6,006
-
lb
- $2,744
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $57,028 $800 $80,222
2,073,564
kWh
$19,349
-
kW-mo/yr
$(-42,543.0)
-
MMBtu
- - - -
07 4.322: Eliminate old stock and modify inventory control $24,960 $25,440 - - - - - $24,960 -
TOTAL RECOMMENDED $135,204 $84,895 $100,142
2,588,804
kWh
$23,590
-
kW-mo/yr
$(-42,543.0)
-
MMBtu
$5,005
-
gal
$6,006
-
lb
$24,960 $18,044
TOTAL IMPLEMENTED $106,807 $30,254 $84,352
2,180,539
kWh
$19,733
-
kW-mo/yr
$(-42,543.0)
-
MMBtu
$5,005
-
gal
- $24,960 $15,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs