Assessment Year | 2004 |
---|---|
Principal Product | Industrial Brakes and Clutches |
NAICS | 333613: Mechanical Power Transmission Equipment Manufacturing |
SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
180,000
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 5,298
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $323,468 | 3,708,011 |
kWh
|
$0.087 |
Natural Gas | $118,211 | 18,525 |
MMBtu
|
$6.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,483 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,357 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $18,156 | $2,400 | - |
$18,156
-
MMBtu
|
|
02 | 2.7111: Reduce illumination to minimum necessary levels | $5,467 | $2,000 |
$5,467
64,023
kWh
|
- | |
03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $3,420 | $920 | - |
$3,420
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,890 | $225 |
$2,890
33,860
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,550 | $1,000 |
$2,550
29,824
kWh
|
- | |
TOTAL RECOMMENDED | $32,483 | $6,545 |
$10,907
127,707
kWh
|
$21,576
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,357 | $2,225 |
$8,357
97,883
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs