ITAC Assessment: UM0248
ITAC logo
ITAC Assessment: UM0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Industrial Brakes and Clutches
NAICS 333613: Mechanical Power Transmission Equipment Manufacturing
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 180,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 5,298
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $323,468 3,708,011
kWh
Natural Gas $118,211 18,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $18,156 $2,400 - $18,156
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $5,467 $2,000 $5,467
64,023
kWh
-
03 2.7491: Insulate glazing, walls, ceilings, and roofs $3,420 $920 - $3,420
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,890 $225 $2,890
33,860
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $2,550 $1,000 $2,550
29,824
kWh
-
TOTAL RECOMMENDED $32,483 $6,545 $10,907
127,707
kWh
$21,576
-
MMBtu
TOTAL IMPLEMENTED $8,357 $2,225 $8,357
97,883
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs