ITAC Assessment: UM0240
ITAC logo
ITAC Assessment: UM0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Corrugated Containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 160,000
ft2
Annual Production 44,000
ton
Production Hrs. Annual 1,980
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,688 5,728,450
kWh
Electricity Demand $243,488 13,375
kW-mo/yr
Electricity Fees $3,721 -
Natural Gas $489,563 56,660
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,305 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $86,885

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $28,120 $1,000 - - $28,120
-
MMBtu
-
02 2.4323: Use optimum size and capacity equipment $17,060 $5,000 $15,150
612,695
kWh
$1,910
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $16,440 $2,500 - - $17,490
-
MMBtu
$(-1,050.0)
04 2.7243: Improve air circulation with destratification fans / other methods $14,980 $9,450 $(-320.0)
(-12,960)
kWh
$(-945.0)
-
kW-mo/yr
$16,245
-
MMBtu
-
05 2.4224: Upgrade controls on compressors $14,410 $5,000 $7,155
289,340
kWh
$7,255
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $9,445 $2,700 - - $9,445
-
MMBtu
-
07 2.7111: Reduce illumination to minimum necessary levels $7,305 $500 $7,305
295,343
kWh
- - -
08 2.2511: Insulate bare equipment $6,425 $414 - - $6,425
-
MMBtu
-
09 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,550 $1,100 $1,130
45,865
kWh
$2,420
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,570 $4,301 $1,730
70,052
kWh
$840
-
kW-mo/yr
- -
TOTAL RECOMMENDED $120,305 $31,965 $32,150
1,300,335
kWh
$11,480
-
kW-mo/yr
$77,725
-
MMBtu
$(-1,050.0)
TOTAL IMPLEMENTED $86,885 $15,100 $30,740
1,243,243
kWh
$11,585
-
kW-mo/yr
$45,610
-
MMBtu
$(-1,050.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs