ITAC Assessment: UM0238
ITAC logo
ITAC Assessment: UM0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Painted Automobile Parts
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 70,000
ft2
Annual Production 36,000,000
pieces
Production Hrs. Annual 3,500
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,664 3,556,980
kWh
Electricity Demand $135,260 7,365
kW-mo/yr
Natural Gas $289,456 48,762
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,085

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Product Savings
01 3.1191: Change procedures / equipment / operating conditions $55,000 $24,610 - - - - $55,000
02 2.2514: Cover open tanks $28,130 $2,624 - - $12,445
-
MMBtu
$15,685
-
Tgal
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,191 $18,246 $1,837
79,040
kWh
$4,354
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,950 $150 $2,850
122,797
kWh
$3,100
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $6,485 $8,300 - - $6,485
-
MMBtu
- -
06 2.2437: Recover waste heat from equipment $3,280 $2,600 $(-132.0)
(-5,622)
kWh
$(-355.0)
-
kW-mo/yr
$3,767
-
MMBtu
- -
07 2.7111: Reduce illumination to minimum necessary levels $1,520 $895 $518
22,295
kWh
$1,002
-
kW-mo/yr
- - -
08 2.4221: Install compressor air intakes in coolest locations $924 $1,000 $444
19,065
kWh
$480
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $107,480 $58,425 $5,517
237,575
kWh
$8,581
-
kW-mo/yr
$22,697
-
MMBtu
$15,685
-
Tgal
$55,000
TOTAL IMPLEMENTED $42,085 $11,969 $3,368
145,092
kWh
$4,102
-
kW-mo/yr
$18,930
-
MMBtu
$15,685
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs