ITAC Assessment: SU0386
ITAC logo
ITAC Assessment: SU0386
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Garden Sprayers/Foggers
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 194
Plant Area 212,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,585 3,210,914
kWh
Electricity Demand $71,694 8,645
kW-mo/yr
Electricity Fees $5,757 -
Natural Gas $38,243 5,561
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,431

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $3,837 - - - - $3,837
02 2.8121: Apply for tax-free status for energy purchases $2,454 - - - - $2,454
03 2.4314: Use synthetic lubricant $2,140 - $1,483
41,184
kWh
$657
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,252 - $1,252
34,771
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $638 $245 $28
788
kWh
$9
-
kW-mo/yr
$504 $97
06 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $2,504 $2,012 $2,504
69,542
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $1,502 $2,362 $1,502
41,726
kWh
- - -
08 2.4321: Upgrade obsolete equipment $104 $463 $79
2,190
kWh
$25
-
kW-mo/yr
- -
TOTAL RECOMMENDED $14,431 $5,082 $6,848
190,201
kWh
$691
-
kW-mo/yr
$504 $6,388
TOTAL IMPLEMENTED $8,431 $2,607 $1,530
42,514
kWh
$9
-
kW-mo/yr
$504 $6,388
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs