ITAC Assessment: ND0035
ITAC logo
ITAC Assessment: ND0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PVC AND ABS PIPE FITTING
NAICS
n/a
SIC 3088: Plastics Plumbing Fixtures
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 6,500,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,568 4,052,755
kWh
Natural Gas $12,680 3,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,537 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,063

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,788 $7,000 $2,788
59,203
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $474 $654 $619
13,189
kWh
$(-145.0)
03 2.6232: Install set-back timers $517 $200 $517
11,137
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $758 $500 $758
16,120
kWh
-
TOTAL RECOMMENDED $4,537 $8,354 $4,682
99,649
kWh
$(-145.0)
TOTAL IMPLEMENTED $4,063 $7,700 $4,063
86,460
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs