ITAC Assessment: BS0093
ITAC logo
ITAC Assessment: BS0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Sheet Metal
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 36
Plant Area 23,000
ft2
Annual Production 1,100,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,008 764,186
kWh
Electricity Demand $12,801 2,732
kW-mo/yr
Electricity Fees $631 -
Natural Gas $12,377 1,732
MMBtu
LPG $5,100 199
MMBtu
TOTAL YEARLY COSTS $74,918
RECOMMENDED SAVINGS* $3,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $1,874 $500 - - $1,874
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $999 $4,977 $985
17,100
kWh
$14
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $146 $30 $146
2,526
kWh
- -
04 2.7241: Install outside air damper / economizer on hvac unit $58 $590 $58
1,000
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $203 $628 $147
2,545
kWh
$56
-
kW-mo/yr
-
TOTAL RECOMMENDED $3,280 $6,725 $1,336
23,171
kWh
$70
-
kW-mo/yr
$1,874
-
MMBtu
TOTAL IMPLEMENTED - - - - -