ITAC Assessment: UM0236
ITAC logo
ITAC Assessment: UM0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Container Board Packaging
NAICS
n/a
SIC 2650:
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 268,000
ft2
Annual Production 50,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,029 6,318,873
kWh
Electricity Demand $59,074 12,979
kW-mo/yr
Electricity Fees $3,819 -
Natural Gas $257,433 77,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,861

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $9,379 $700 - - $9,379
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,424 $2,000 $6,936
203,809
kWh
$1,488
-
kW-mo/yr
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $7,861 $2,500 - - $7,861
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $2,209 $500 $1,818
53,417
kWh
$391
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $1,777 $2,400 - - $1,777
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $680 $5,018 $648
19,052
kWh
$32
-
kW-mo/yr
-
TOTAL RECOMMENDED $30,330 $13,118 $9,402
276,278
kWh
$1,911
-
kW-mo/yr
$19,017
-
MMBtu
TOTAL IMPLEMENTED $7,861 $2,500 - - $7,861
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs