Assessment Year | 2002 |
---|---|
Principal Product | Hub and rotor assemblies |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $100 M to 500M |
# of Employees | 243 |
Plant Area |
145,000
ft2
|
Annual Production | 2,520,000
pieces
|
Production Hrs. Annual | 2,880
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $852,877 | 13,431,600 |
kWh
|
$0.063 |
Electricity Demand | $405,355 | 28,716 |
kW-mo/yr
|
$14.12 |
Electricity Fees | $(-357,182.0) | - |
|
- |
Natural Gas | $96,933 | 10,298 |
MMBtu
|
$9.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,796 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,194 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,160 | $500 |
$1,580
36,000
kWh
|
$1,580
-
kW-mo/yr
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $3,344 | $958 |
$1,734
47,214
kWh
|
$1,610
-
kW-mo/yr
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $1,704 | $5,850 |
$1,080
29,260
kWh
|
$624
-
kW-mo/yr
|
- | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $23,898 | $3,150 |
$(-233.0)
(-6,307)
kWh
|
$(-121.0)
-
kW-mo/yr
|
$24,252
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,530 | $3,000 |
$7,560
204,749
kWh
|
$3,970
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $37,000 | $9,500 |
$2,200
59,800
kWh
|
$34,800
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $7,160 | $1,250 |
$4,690
127,146
kWh
|
$2,470
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $87,796 | $24,208 |
$18,611
497,862
kWh
|
$44,933
-
kW-mo/yr
|
$24,252
-
MMBtu
|
||
TOTAL IMPLEMENTED | $62,194 | $15,208 |
$17,764
474,909
kWh
|
$44,430
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs