ITAC Assessment: LL0172
ITAC logo
ITAC Assessment: LL0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Gasoline
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range greater than $500
M
# of Employees 249
Plant Area 12
ft2
Annual Production 29,200,000
bbl
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,468,988 102,540,253
kWh
Electricity Fees $174,291 -
Natural Gas $2,560,523 535,303
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $879,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $502,957

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2135: Repair and eliminate steam leaks $390,733 $195,000 - - $390,733
-
MMBtu
-
02 2.1115: Eliminate combustible gas in flue gas $197,664 $250,000 - - $197,664
-
MMBtu
-
03 2.2511: Insulate bare equipment $101,833 $7,757 - - $101,833
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $87,485 $28,240 $84,201
1,926,796
kWh
$3,284 - -
05 2.3321: Use steam pressure reduction to generate power $65,820 $312,701 $166,140
3,801,840
kWh
$6,479 $(-106,799.0)
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $21,972 $5,600 - - $21,972
-
MMBtu
-
07 2.2511: Insulate bare equipment $5,380 $682 - - $5,380
-
MMBtu
-
08 2.7134: Use photocell controls $3,809 $1,176 $3,666
83,886
kWh
$143 - -
09 2.8123: Pay utility bills on time $2,767 $30 - $2,767 - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,141 $1,050 $896
20,498
kWh
$35 - $1,210
TOTAL RECOMMENDED $879,604 $802,236 $254,903
5,833,020
kWh
$12,708 $610,783
-
MMBtu
$1,210
TOTAL IMPLEMENTED $502,957 $228,870 $84,201
1,926,796
kWh
$6,051 $412,705
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs