ITAC Assessment: UM0221
ITAC logo
ITAC Assessment: UM0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Chassis Components
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 620
Plant Area 270,000
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $918,057 17,212,202
kWh
Electricity Demand $304,532 35,789
kW-mo/yr
Electricity Fees $16,055 -
Natural Gas $321,872 94,091
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,826 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,586

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1114: Limit and control secondary combustion air in furnace $40,400 $4,000 - - $40,400
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,486 $7,425 $15,456
441,614
kWh
$5,030
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $8,720 $2,000 - - $8,720
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $8,700 $1,250 $6,510
187,596
kWh
$2,190
-
kW-mo/yr
-
05 2.6231: Utilize controls to operate equipment only when needed $18,750 $12,870 $18,750
540,234
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $14,580 $42,883 $9,107
262,388
kWh
$5,473
-
kW-mo/yr
-
07 2.7111: Reduce illumination to minimum necessary levels $1,650 $2,000 $1,650
47,404
kWh
- -
08 2.2531: Re-size charging openings or add movable cover or door $4,075 $3,000 - - $4,075
-
MMBtu
09 2.4239: Eliminate or reduce compressed air usage $3,340 $8,500 $2,000
37,694
kWh
$1,340
-
kW-mo/yr
-
10 2.2437: Recover waste heat from equipment $1,125 $2,000 - - $1,125
-
MMBtu
TOTAL RECOMMENDED $121,826 $85,928 $53,473
1,516,930
kWh
$14,033
-
kW-mo/yr
$54,320
-
MMBtu
TOTAL IMPLEMENTED $69,586 $12,675 $21,966
629,210
kWh
$7,220
-
kW-mo/yr
$40,400
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs