ITAC Assessment: UM0218
ITAC logo
ITAC Assessment: UM0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Electroplating, mechanical plating, and phosphating
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 95,000
ft2
Annual Production 74,874,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $295,747 4,536,000
kWh
Electricity Demand $50,261 10,962
kW-mo/yr
Electricity Fees $(-5.0) -
Natural Gas $271,493 52,554
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,450 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.6218: Turn off equipment when not in use $1,191 $200 $1,191
18,255
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,305 $900 $4,893
75,046
kWh
$412
-
kW-mo/yr
- -
03 2.4224: Upgrade controls on compressors $10,926 $300 $10,926
167,581
kWh
- - -
04 2.4239: Eliminate or reduce compressed air usage $6,446 $3,700 $5,946
91,202
kWh
$500
-
kW-mo/yr
- -
05 2.7243: Improve air circulation with destratification fans / other methods $6,357 $2,100 - - $6,357
-
MMBtu
-
06 2.2437: Recover waste heat from equipment $10,551 $3,000 - - $10,551
-
MMBtu
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,604 $2,500 $14,787
226,800
kWh
$3,628
-
kW-mo/yr
$(-4,811.0)
-
MMBtu
-
08 2.2511: Insulate bare equipment $2,470 $800 - - $2,470
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $11,415 $36,321 $5,097
78,175
kWh
$708
-
kW-mo/yr
- $5,610
-
lb
10 2.4235: Remove or close off unneeded compressed air lines $2,185 $100 $2,185
33,516
kWh
- - -
TOTAL RECOMMENDED $70,450 $49,921 $45,025
690,575
kWh
$5,248
-
kW-mo/yr
$14,567
-
MMBtu
$5,610
-
lb
TOTAL IMPLEMENTED $35,306 $7,500 $23,056
353,617
kWh
$4,040
-
kW-mo/yr
$8,210
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs