Assessment Year | 2002 |
---|---|
Principal Product | Heat Treatment |
NAICS |
n/a
|
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
15,000
ft2
|
Annual Production | 10,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $75,415 | 1,251,495 |
kWh
|
$0.060 |
Electricity Demand | $12,353 | 654 |
kW-mo/yr
|
$18.89 |
Electricity Fees | $(-405.0) | - |
|
- |
Natural Gas | $28,730 | 5,558 |
MMBtu
|
$5.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,332 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,906 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $396 | $75 |
$158
6,887
kWh
|
$238
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $310 | $600 |
$130
5,255
kWh
|
$180
-
kW-mo/yr
|
- | - | |
03 | 2.6218: Turn off equipment when not in use | $800 | $1,170 |
$800
34,913
kWh
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $290 | $680 |
$290
30,128
kWh
|
- | - | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $2,326 | $2,100 | - | - |
$2,326
-
MMBtu
|
- | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $300 | $50 |
$300
4,992
kWh
|
- | - | - | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $2,860 | $2,500 | - | - | - | $2,860 | |
08 | 2.1133: Adjust burners for efficient operation | $2,050 | $1,350 | - | - |
$2,050
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $9,332 | $8,525 |
$1,678
82,175
kWh
|
$418
-
kW-mo/yr
|
$4,376
-
MMBtu
|
$2,860 | ||
TOTAL IMPLEMENTED | $5,906 | $5,205 |
$578
42,270
kWh
|
$418
-
kW-mo/yr
|
$2,050
-
MMBtu
|
$2,860 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs