Assessment Year | 2004 |
---|---|
Principal Product | Wires |
NAICS | 331222: Steel Wire Drawing |
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | n/a |
# of Employees | 90 |
Plant Area |
91,230
ft2
|
Annual Production | 0
thousand feet
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $415,447 | 14,918,026 |
kWh
|
$0.028 |
Electricity Demand | $108,665 | 29,501 |
kW-mo/yr
|
$3.68 |
Natural Gas | $531,555 | 875,419 |
MMBtu
|
$0.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $78,363 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,148 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $26,371 | $96,020 |
$19,791
706,833
kWh
|
$6,580
-
kW-mo/yr
|
- | - | |
02 | 2.3212: Optimize plant power factor | $21,672 | $30,000 | - | - | - | $21,672 | |
03 | 2.1213: Direct warmest air to combustion intake | $12,326 | $49,000 | - | - |
$12,326
-
MMBtu
|
- | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $7,850 | $32,428 |
$7,850
280,385
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,576 | $5,393 |
$4,724
168,704
kWh
|
$852
-
kW-mo/yr
|
- | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $3,148 | - |
$1,929
68,890
kWh
|
$1,219
-
kW-mo/yr
|
- | - | |
07 | 2.7131: Add area lighting switches | $1,420 | $8,148 |
$1,420
40,563
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $78,363 | $220,989 |
$35,714
1,265,375
kWh
|
$8,651
-
kW-mo/yr
|
$12,326
-
MMBtu
|
$21,672 | ||
TOTAL IMPLEMENTED | $3,148 | - |
$1,929
68,890
kWh
|
$1,219
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs