ITAC Assessment: UF0342
ITAC logo
ITAC Assessment: UF0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Wires
NAICS 331222: Steel Wire Drawing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range n/a
# of Employees 90
Plant Area 91,230
ft2
Annual Production 0
thousand feet
Production Hrs. Annual 8,640
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $415,447 14,918,026
kWh
Electricity Demand $108,665 29,501
kW-mo/yr
Natural Gas $531,555 875,419
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,363 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,148

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $26,371 $96,020 $19,791
706,833
kWh
$6,580
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $21,672 $30,000 - - - $21,672
03 2.1213: Direct warmest air to combustion intake $12,326 $49,000 - - $12,326
-
MMBtu
-
04 2.6231: Utilize controls to operate equipment only when needed $7,850 $32,428 $7,850
280,385
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,576 $5,393 $4,724
168,704
kWh
$852
-
kW-mo/yr
- -
06 2.7124: Make a practice of turning off lights when not needed $3,148 - $1,929
68,890
kWh
$1,219
-
kW-mo/yr
- -
07 2.7131: Add area lighting switches $1,420 $8,148 $1,420
40,563
kWh
- - -
TOTAL RECOMMENDED $78,363 $220,989 $35,714
1,265,375
kWh
$8,651
-
kW-mo/yr
$12,326
-
MMBtu
$21,672
TOTAL IMPLEMENTED $3,148 - $1,929
68,890
kWh
$1,219
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs