ITAC Assessment: UM0214
ITAC logo
ITAC Assessment: UM0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Automotive Interiors
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 508
Plant Area 180,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,128
hrs
Location (State) Michigan
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $444,072 17,185,560
kWh
Electricity Demand $708,615 39,324
kW-mo/yr
Electricity Fees $15,564 -
Natural Gas $47,081 12,191
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $155,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $142,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $5,260 $4,500 - - $5,260
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $142,000 $30,400 - $142,000
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $4,540 $2,200 $2,812
66,900
kWh
$1,728
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $850 $375 $310
11,991
kWh
$540
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $2,439 $1,000 $873
33,521
kWh
$1,566
-
kW-mo/yr
-
TOTAL RECOMMENDED $155,089 $38,475 $3,995
112,412
kWh
$145,834
-
kW-mo/yr
$5,260
TOTAL IMPLEMENTED $142,850 $30,775 $310
11,991
kWh
$142,540
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs